Rigging work
12.8 Rigging the auxiliary hoist
12 - 100 3 112 993 en Operating manual GMK 6400
12.07.2013
12.8.7 Establishing/disconnecting the hydraulic connection
Establishing The connection must be established before the auxiliary hoist can be locked
and operated.
• Remove the caps from the ports (3).
• Remove the hoses (2) from the brackets (1)
and connect them to the ports (3).
Disconnecting The connection must be disconnected before the auxiliary hoist is hoisted
from the 15 t base plate.
• Remove the hoses (2) from the connections
(3).
• Close all the hoses and connections with the
caps.
• Fit the hoses (2) into the brackets (1).