Driving modes and rigging for on-road driving
6.5 Installing/removing the supporting box
Operating manual GMK 6400 3 112 993 en 6 - 57
12.07.2013
6.5.2 CHECKLIST: Installing the supporting box
H
This checklist is not a complete operating manual. There are accompanying
operating instructions which are indicated by cross-references.
Observe the warnings and safety instructions specified there.
1. Rig the outrigger span 7.98 x 8.50/1.00 m (26.1 x 27.9/3.3 ft) and align
the truck crane horizontally;
à p. 6 - 59.
2. With the RCL set accordingly, raise the main boom and slew the super-
structure into the position for raising the outrigger box;
à Crane movements during installation and removal, p. 6 - 69.
3. Sling the supporting box to the truck crane and remove from the sepa-
rate vehicle;
à Slinging points on the supporting box, p. 6 - 70.
If the outrigger box was placed on the supports:
Retract the supports;
à p. 6 - 67.
4. Suspend the rear outrigger box in the holders on the carrier;
à p. 6 - 65.
s