Malfunctions during crane operation
14.6 Hydraulic emergency operation
Operating manual GMK 6400 3 112 993 en 14 - 63
12.07.2013
14.6.4 Establishing the required hydraulic circuits
To establish an hydraulic circuit, switch over the required valves.
Switching over
valves
The valves 1 to 7 are numbered.
For crane operation
• Switch the valves 1 to 7 inwards.
s
G
Danger from mutual interference of the power units
For crane operation, always switch all the valves 1 to 7 inwards. This pre-
vents the power units from suddenly starting to move.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK 6400 and is the answer not in the manual?

Manitowoc GROVE GMK 6400 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK 6400
CategoryConstruction Equipment
LanguageEnglish

Related product manuals