EasyManuals Logo
Home>Manitowoc>Construction Equipment>GROVE GMK 6400

Manitowoc GROVE GMK 6400 User Manual

Manitowoc GROVE GMK 6400
960 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #817 background imageLoading...
Page #817 background image
Rigging work
12.8 Rigging the auxiliary hoist
Operating manual GMK 6400 3 112 993 en 12 - 101
12.07.2013
12.8.8 Making/breaking the electrical connection
Establishing The connection must be established before the auxiliary hoist can be locked
and operated.
• Remove plug (2) from socket (1) and insert it
into socket (3).
• Cover the socket (1) with the cap.
Disconnecting The connection must be disconnected before the auxiliary hoist is hoisted
from the 15 t base plate.
• Remove the plug (2) from the socket (3).
• Wind the cable onto the bracket (4) and
insert the plug (2) into the socket (1).
• Cover the socket (3) with the cap.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK 6400 and is the answer not in the manual?

Manitowoc GROVE GMK 6400 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK 6400
CategoryConstruction Equipment
LanguageEnglish

Related product manuals