Rigging work
12.8 Rigging the auxiliary hoist
Operating manual GMK 6400 3 112 993 en 12 - 101
12.07.2013
12.8.8 Making/breaking the electrical connection
Establishing The connection must be established before the auxiliary hoist can be locked
and operated.
• Remove plug (2) from socket (1) and insert it
into socket (3).
• Cover the socket (1) with the cap.
Disconnecting The connection must be disconnected before the auxiliary hoist is hoisted
from the 15 t base plate.
• Remove the plug (2) from the socket (3).
• Wind the cable onto the bracket (4) and
insert the plug (2) into the socket (1).
• Cover the socket (3) with the cap.