Paper Deck Path Kit-B1
Checking before Installation
â– Points to Note before Installation
When installing this equipment, be sure to note the following points.
• This equipment machine weighs Through Pass Unit: approx. 20.0 kg and Right Connection Unit: approx. 12.3 kg. It is
recommended to lift it with 2 people or more. However, if there is a standard to handle a heavy load in each sales company,
follow it for operation. Also, make sure to lift the machine with keeping it level at operation.
• Because the gravity center of the Through Pass Unit is in the right side, lift with care.
â– Checking the Contents
Unpacking
â– Unpacking Procedure
NOTE:
• The device is fixed for shipment with fixing tapes and impact absorbing materials to protect from vibration and the shock in
the transportation. According to steps, install after removing all fixing tapes and impact absorbing materials.
5. Paper Feed Options
479