2/3 2/4 4 Hole Puncher Unit-A1
Checking Before Installation
â– Checking Before Installation
When installing this Equipment together with the Finisher, install this Equipment before installing the Finisher to the Upstream
Connection Machine.
â– Product Name
Safety regulations require the product's name to be registered. In some regions where this product is sold, the following name
may be registered instead.
• F281060
â– Installation Outline Drawing
Unpacking Procedure
1. Open the container box, and then take out the Punch Unit and the contents.
2. Remove all cushioning materials and tapes from outside of the Punch Unit.
6. Paper Output Options
800