14. Connect the Shunt Cable.
• 1 Screw (use the screw removed in step 13)
• 1 Screw (RS tightening; M4x10)
Adjusting the Height
Depending on the status of the floor of the installation site,the height of the finisher may need to be adjusted. If the height is not
properly adjusted, trouble such as paper frequently jamming in the Finisher Pickup Assembly may occur. Follow the steps below
to check the height and adjust it if necessary.
6. Paper Output Options
711