19. Close the Front Cover of the Finisher.
20. Install the Rear Cover of the Finisher.
• 3 Screws
• 3 Claws
21. Refer to the installation procedure of the Finisher to Install the Finisher in the Upstream Connection Machine.
Disposal Parts Check
1. Following disposal parts are remained after completion of the installation work.
[1] Inlet Feed Guide 1pc.
[2] Rear Inner Cover 1pc.
[3] Magnet Unit 1pc.
[4] Screw (TP ; M3x6) 1pc.
[5] Punch Cover (Front) 1pc.
[6] Face Cover 1pc.
Operation Check
1. Turn ON the main power of the Host Machine.
6. Paper Output Options