13. Return the jam recovery map and close the front upper cover.
Checking after Installation
â– Disposal Parts
1. Following disposal parts are remained after completion of the installation work.
• When connected to the host machine (upstream equipment)
[1] Face cover of the host machine 2pcs.
[2] Screw (Binding; M4x10) 1pc.
[3] Stopper (front) 1pc.
[4] Stopper (rear) 1pc.
[5] Screw (Flat Head Screw; M3x5) 2pcs.
[6] Interface Cable 1pc.
[7] Removed face cover 1pc.
[8] Remaining Language Jam label 1pc.
• When connected to the Document Insertion Unit (upstream equipment)
[1] Stopper (front) 1pc.
[2] Stopper (rear) 1pc.
[3] Screw (Flat Head Screw; M3x5) 2pcs.
[4] Removed face cover 1pc.
[5] Remaining Language Jam label 1pc.
â– Operation Checks
1. When all the installations have completed, check that the Leakage Breaker is turned ON.
6. Paper Output Options