Installation and Maintenance Manual - Aastra 5000 AMT/PTD/PBX/0058/4/6/EN
Installation and activation 01/2011 Page 351
6.3 Operations on a site already installed
There are several types of operations on a completed installation site:
Hardware operations:
• Handling a card
• Adding a CLX card
• Adding an equipment card
• Adding a daughter card to an expansion card or CPU card (EIP)
• Adding an expansion cabinet
• Adding a power module
• Changing to DUPLEX configuration for AXD
Software operations:
• Updating the iPBX software
• Backing up the configuration
• Restoring the configuration associated with the use of VUs
6.3.1 Equipment checklist
If the customer wishes to install equipment from an existing installation, e.g. the customer
may supply a common bell device and an external music source, to determine the overall
size of the new installation, produce a full equipment checklist:
• Existing equipment
• New equipment.