2-6 CASE Revision C
2060290-201
CASE System
Mains Connection, Power Up, Functional Test
Note
Before powering the system up, read the safety information in
section “Safety Information” on page 1-4.
1. Connect CASE to the power line and secure the power cord with the
clamp provided.
Note
DO NOT turn the system on yet.
2. Connect the system to the potential equalization system.
3. Connect all other system components to the power line and put them
into operation as outlined in the respective operator manuals.
4. Turn on the mains power switch on the back of the system.
85A
Power inlet
Potential
equalization pin
Mains power
switch
Back Panel
Cable clamp