4-22 Section 4-2 - General Procedure
4-3-5 ECG Checks
Connect the ECG Harness and check:
4-3-6 Cineloop Check
For activating Cine, creating and storing Cine Loops, and information on the Cine Timeline, refer to the
LOGIQ™ 7 Quick Guide.
4-3-7 Backend Processor Checks
• If all the previous tests have been passed successfully, the backend processor is most likely OK.
• See Service Platform.
• If the system seems to be operating erratically, please refer to Chapter 7, Diagnostic/
Troubleshooting.
4-3-8 Probe/Connectors Usage (QG)
The LOGIQ™ 7 Quick Guide, provides information on connecting, activating, deactivating and
disconnecting probes.
Table 4-4 ECG Control
Step Task Expected Result(s)
1
Connect the ECG at the Connector on the
Front of the system
It will display a curve along the bottom edge
of the image sector