GE HEALTHCARE
DIRECTION 2286865, REVISION 14 LOGIQ™ 7 SERVICE MANUAL
Section 2-1 - Overview 2-1
Chapter 2
Pre Installation
Section 2-1
Overview
2-1-1 Purpose of this chapter 2
This chapter provides the information required to plan and prepare for the installation of a LOGIQ™ 7.
Included are descriptions of the facility and electrical needs to be met by the purchaser of the unit. A
checklist is also provided at the end of this section to help determine whether the proper planning and
preparation is accomplished before the actual equipment installation is scheduled.
Table 2-1 Contents in Chapter 2
Section Description Page Number
2-1
Overview
2-1
2-2
General Console Requirements
2-2
2-3
Facility Needs
2-7