GE HEALTHCARE
DIRECTION 2286865, REVISION 14 LOGIQ™ 7 SERVICE MANUAL
Section 4-2 - General Procedure 4-3
4-2-2-1 Power Up (cont’d)
4.) Press the ON/OFF
key at the front of the System once.
4-2-2-2 Power Up Sequence
NOTE: For consoles with BEP4 (BT09), power switch lamp is darker compared to existing BT04-BT07
consoles with BEP3. This is NOT abnormality and system will function normally regardless of
the brightness of the power button.
1.) The Start Up Screen will be shown on the Monitor display when the system is turned ON.
Figure 4-2 Power On/Off Standby Switch Location
Figure 4-3 Start Up Screen