The basic sequence of tasks are shown in an example.
Step 1
"Phase3" within ROP2 has been disrupted in the example. Before the batch can be continued
in a new unit, the product first needs to be conveyed to an "intermediate container".
Step 2
To block the execution of steps that have already been completed, the first element of each
step sequence (ROP1 within recipe unit procedure and the first transition within ROP2) must
be marked with a breakpoint (command: Breakpoint" > "Set").
BATCH Control Center
9.8 Batch control
SIMATIC BATCH V8.2
Operating Manual, 02/2016, A5E35958174-AA 453