The two recipe elements (ROP_3 and RPH_3) that have not yet run and been deleted are
neither displayed in the control recipe window of BatchCC nor in the report or in XML archive
format.
9.8.8.8 How do I perform an online structure change?
Introduction
The following example shows you how to perform an online structure change and provides
you with background information on the system behavior.
Requirements
● SIMATIC Logon is installed.
● You have the individual permission "Begin structure change" in permission management.
● The value of the "Allow online structure changes" project setting under Options > Settings
> Project setting > Batches is activated.
● The master recipe or formula used for a batch has been released for testing.
● No recipe unit procedure of the master recipe used may be executed on the AS.