M800S/M80/E80 Series Connection and Setup Manual
9 Connection of Operation Panel I/O Unit
269
IB-1501269-J
(2) Connecting with 12V manual pulse generator (maximum cable length: 50m)
Connect the 12V manual pulse generator to the connector MPG.
(Note 1) When selecting a manual pulse generator, make sure that its case and 0V terminal are insulated.
(Note 2) Select 25pulse/rev or 100pulse/rev on the parameter screen.
<Related items>
Cable drawing: "Cable: J020/J021/J022 Cable" and "Cable: J023/J024/J025 Cable"
Connector pin assignment: "General Specifications: Operation Panel I/O Unit" (MPG connector)
MPG
12V 0V A B
NO.1
NO.1NO.2
NO.2NO.3 NO.1
12V 0V A B 12V 0V A B
12V 0V A B 12V 0V A B 12V 0V A B
J020
J021
 J022
12V manual pulse
generator
HD60C (Rear view)
When connecting three
12V manual pulse
generators
When connecting two
12V manual pulse
generators
When connecting one
12V manual pulse
generator
Operation panel
I/O unit