EasyManuals Logo
Home>Roche>Measuring Instruments>Cedex Bio System

Roche Cedex Bio System User Manual

Roche Cedex Bio System
496 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #443 background imageLoading...
Page #443 background image
Roche Diagnostics
Operatorโ€™s Manual ยท Version 3.1 E-53
Cedex Bio System 14 ISE maintenance
ISE maintenance actions
Initialize ISE unit
f Utilities > Maintenance > Initialize ISE Unit
Initializing the ISE unit uses Activator to condition the electrodes and to adjust the
sensors and the pump action. This ensures proper transportation of fluids through
the ISE tubing.
Operator time Approximately 3 minutes.
Prerequisites The system must be in Standby status.
Tools and materials required m Activator
a To initialize the ISE unit
1
Select the maintenance action Initialize ISE Unit.
2
Press .
The maintenance definition screen is displayed.
3
Press to start the action.
A placement list is displayed.
4
Place the Activator on the sample area positions indicated on the screen.
5
Press to confirm the placement and to start the action.
A message will inform you when the maintenance action is complete.
6
Remove the Activator from the sample area.
7
Press .
Make sure that you have read and understood section Safety information on page E-42.
The following warning messages in particular are relevant:
o Infection by biohazardous materials on page E-42.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Roche Cedex Bio System and is the answer not in the manual?

Roche Cedex Bio System Specifications

General IconGeneral
BrandRoche
ModelCedex Bio System
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals