EasyManuals Logo
Home>Roche>Measuring Instruments>Cedex Bio System

Roche Cedex Bio System User Manual

Roche Cedex Bio System
496 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #444 background imageLoading...
Page #444 background image
Roche Diagnostics
E-54 Operatorโ€™s Manual ยท Version 3.1
14 ISE maintenance Cedex Bio System
ISE maintenance actions
Replace ISE pump tubing
f Utilities > Maintenance > Replace ISE Pump Tubing
Replacing the pump tubing ensures proper ISE pump action.
During the Replace ISE Pump Tubing maintenance action, the following
maintenance actions are automatically performed:
o Prime ISE Reference and Calib.
o Initialize ISE Unit
Operator time Approximately 10 minutes.
Prerequisites The system must be in Standby status.
Tools and materials required m Activator
m Roche approved ISE pump tubing set
a To replace the ISE pump tubing
1
Select the maintenance action Replace ISE Pump Tubing.
2
Press .
The maintenance definition screen is displayed.
3
Press to start the action.
The placement screen is displayed.
4
Place the Activator on the sample area position indicated on the screen.
5
Press to confirm the placement.
The tubing is emptied.
Your are asked to remove the tubing.
6
Open the ISE cover.
Make sure that you have read and understood section Safety information on page E-42.
The following warning messages in particular are relevant:
o Injury through working solutions on page E-42.
o Infection by biohazardous materials on page E-42.
o Infection by waste solution on page E-43.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Roche Cedex Bio System and is the answer not in the manual?

Roche Cedex Bio System Specifications

General IconGeneral
BrandRoche
ModelCedex Bio System
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals