D
IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
8-156 Section 8-33 - Replacement of the Paper tray
Section 8-33
Replacement of the Paper tray
8-33-1 Manpower
1 Person, 1 minutes.
8-33-2 Tools
None Required.
8-33-3 Removal Procedure
1) Remove Paper tray from Top Cover.
Figure 8-184 Removal of Paper tray
8-33-4 Installation Procedure
1) Align the assembly point and put the Paper Tray on Top Cover.
8-33-5 Functional Check
Visual inspection Only.

Table of Contents

Other manuals for GE LOGIQ P7

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P7 and is the answer not in the manual?

GE LOGIQ P7 Specifications

General IconGeneral
BrandGE
ModelLOGIQ P7
CategoryMedical Equipment
LanguageEnglish

Related product manuals