GEDRAFT LOGIQ P9/P7
D
IRECTION 5604324, REVISION 11 DRAFT (JANUARY 24, 2019) SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-203
16.) Remove the THRUST NEEDLE BEARING WASHER 5578, THRUST NEEDLE BEARING 5578,
OPIO SWIVEL SHAFT from the UP DOWN LINK ARM in order.
8-50-4 Installation Procedure
Parts to be installed in reverse order on removal. But ROTATION PLATE, OPIO SWIVEL SHAFT,
ROTATE LEVER BRKT and ROTATION MODULE ASSY should be reassembled using new parts.
8-50-5 Functional Check
CAUTION
do
Do not wipe out grease from part.
Test Refer to Note
System Exterior Visual Check
section 4-3-1 of LOGIQ P9P7 PSM(GPN : 5599028)
Mechanical Parts Functional Check
section 4-3-2 of LOGIQ P9P7 PSM(GPN : 5599028)
Power On/Off
section 4-3-3 of LOGIQ P9P7 PSM(GPN : 5599028)
System Integration Checks
section 4-3-5 of LOGIQ P9P7 PSM(GPN : 5599028)
OPIO Test only
UP DOWN LINK
THRUST NEEDLE BEARING
OPIO SWIVEL
THRUST NEEDLE BEARING
WASHER 5578
1
2
3

Table of Contents

Other manuals for GE LOGIQ P7

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ P7 and is the answer not in the manual?

GE LOGIQ P7 Specifications

General IconGeneral
BrandGE
ModelLOGIQ P7
CategoryMedical Equipment
LanguageEnglish

Related product manuals