5.2 Installing the motor
5.2.1 Checklists prior to assembly
Note
Required checks
The checks listed below are a minimum benchmark and must be performed in any case.
Further checks before, during and after the installation of the motor depend on the system-
specific conditions and are the responsibility of the plant or system manufacturer.
● Thoroughly familiarize yourself with the safety instructions and observe the checklists below
before starting any work.
Table 5-1 Checklist
Check OK
General checks
Are the environmental conditions in the permissible range? See Chapter "Permissible
environmental conditions for the motor (Page 176)".
Checks regarding the mechanical system
Is the motor free of visible damage?
Have the mounting surfaces (e.g. flange, shaft) on the customer machine and on the
motor been cleaned?
Are the mounting surfaces free of corrosion?
Do the mounting dimensions (e.g. shaft diameter, shaft length, true run) on the customer
machine meet the specification?
Installing
5.2 Installing the motor
SINAMICS S210 servo drive system