GE DRAFT VOLUSON™ P8 / VOLUSON™ P6
DIRECTION 5723243, R
EVISION 6 DRAFT (MAY 23, 2018) BASIC SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-147
Section 8-47
Replacement of the CSI
8-47-1 Manpower
One person, 30 minutes
8-47-2 Tools
Philips screwdriver
8-47-3 Preparations
1.) Power Off/Shutdown the system as described in 4-3-2 on page 4-4.
2.) Pull out the NEST as described in Section 8-28 "Replacement of the NEST" on page 8-93
8-47-4 Removal Procedure
1.) Unscrew 4 screws to remove the LED Indicator bracket.
Figure 8-209 Opening the rear bracket