GE DRAFT VOLUSON™ P8 / VOLUSON™ P6
DIRECTION 5723243, R
EVISION 6 DRAFT (MAY 23, 2018) BASIC SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-179
7.) Unscrew 1 screw and replace the CWD Piggy.
8-56-5 Installation Procedure
1.) Install the new board assy in the reverse order of removal procedure.
2.) Perform: FRU8-48: Functional Checks after FRU replacement (Debrief Guidelines) -
Functional Tests
Figure 8-253 Unscrewing 1 screw and replacing the CWD piggy