GE DRAFT VOLUSON™ P8 / VOLUSON™ P6
DIRECTION 5723243, R
EVISION 6 DRAFT (MAY 23, 2018) BASIC SERVICE MANUAL
Chapter 10 - Care & Maintenance 10-9
10-6-2 Functional Checks
The functional checks take about 60 minutes to perform.
Refer to the Voluson™ P8 / Voluson™ P6 Basic User Manual whenever necessary.
10-6-2-1 System Checks
NOTE: * Some software may be considered standard depending upon system configuration.
Table 10-8 System Functional Checks
Step Item Description
1 B Mode
Verify basic B Mode (2D) operation.
Check the basic system controls that affect this mode of operation.
2 M Mode
Verify basic M Mode operation.
Check the basic system controls that affect this mode of operation.
3 C Mode
Verify basic CFM Mode (Color Flow Mode) operation.
Check the basic system controls that affect this mode of operation.
4 PD Mode
Verify basic PD Mode (Power Doppler Mode) operation.
Check the basic system controls that affect this mode of operation.
5 Doppler Modes
Verify basic Doppler Mode operation (PW ).
Check the basic system controls that affect this mode of operation.
6 3D Mode
Verify basic 3D Mode operation.
Check the basic system controls that affect this mode of operation.
7
RealTime 4D Mode
(optional)
Verify basic RealTime 4D Mode operation.
Check the basic system controls that affect this mode of operation.
8
*Applicable Software
Options
Verify the basic operation of all optional modes.
Check the basic system controls that affect each options operation.
9 Keyboard Test
Perform the Keyboard Test Procedure to verify that all keyboard controls are OK.
10 LCD Monitor
Verify basic LCD Monitor display functions.
11 Measurements
Scan a gray scale phantom(optional) and use the measurement controls to verify distance
and area calculation accuracy.
Refer to the Basic User Manual, for measurement accuracy specifications.