EMC CONFIDENTIAL
PART 2
This phase of the setup includes physically installing the system, cabling it to the
customer’s network, and configuring the Control Station and ConnectHome. This
phase is complete when the system successfully calls home and you have filled out
the hand-off worksheet. The steps to complete this phase are included in the
following chapters:
Chapter 3, “Install Components in Customer’s Cabinet”
This chapter explains how to install the system in a customer’s cabinet for systems
that are not shipped in an EMC cabinet.
Chapter 4, “Connect Cables for a Fabric-connected VG2”
This chapter explains how to cable a fabric-connected VG2 gateway.
Chapter 5, “Connect Cables for a Direct-connected VG2”
This chapter explains how to cable a direct-connected VG2 gateway.
Chapter 6, “Connect Cables for a Fabric-connected VG8”
This chapter explains how to cable a fabric-connected VG8 gateway.
Chapter 7, “Connect Cables for a Direct-connected VG8”
This chapter explains how to cable a direct-connected VG8 gateway.
Chapter 8, “Configure the boot array”
This chapter explains how to configure a VNX array being used as the boot array.
Chapter 9, “Install and Configure EMC NAS Software”
This chapter explains how to install and configure the EMC NAS software on the
Control Station and blades. It also explains how to complete boot array configuration.
Phase 2 Installation