9000 Series Sea Trial Report
The purpose of this Sea Trial Report is to provide a convenient checklist and record of installation, dock trial set up,
and sea trial performance of the ZF Marine Propulsion Systems Miramar 9000 Series Propulsion Control System.
Please enter ALL information. We recommend a copy of this completed form remain aboard the vessel, and require
that you fax a copy to ZF Marine Propulsion Systems Miramar at 425-493-1569.
Table F-226-1: Vessel Information
Your Name: Date:
Contact Name: Telephone:
Vessel Owner: Vessel name:
Builder: Hull #:
Engine Manufacturer Model:
HP: RPM:
Transmission Manufacturer Model:
Ratio: No. of Screws:
No. of Stations (max 5): Sta. 1 Location
Sta. 2 Location Sta. 3 Location
Sta. 4 Location Sta. 5 Location
Table F-226-2: Processor Information
Processor Information Port Stbd
Processor Serial Numbers
Is the Processor subject to excessive heat? (Above 70 degrees C) Yes No Yes No
At least 4 feet (1,2m) from strong magnetic fields? Yes No Yes No
Accessible for checkout, adjustments, and maintenance? Yes No Yes No
Are the Processors bonded (grounded)? Yes No Yes No
Are all Electric Cables supported every 18 inches (45,72cm)? Yes No Yes No
Does the Shift push-pull cable travel in the correct direction? Yes No Yes No
Is the amount of push-pull cable travel set properly for Shift? Yes No Yes No
Does the Throttle push-pull cable travel in the correct direction? Yes No Yes No
Is the amount of push-pull cable travel set properly for Throttle? Yes No Yes No
Are all of the push-pull cable’s fasteners tightened? Yes No Yes No
Are the electrical cable connections tight at the Processors and Control
Heads?
Yes No Yes No
Is the Processor’s Start Interlock Circuit being used? If not, what type of start
interlock is being used?
Yes No Yes No
Is there an Engine Stop Switch installed at each Remote Station? Yes No Yes No