3-12
3
3. Connect the isolator coupler a.
Installing the battery cable
1. Route the battery cable through the bot-
tom cowling.
2. Connect the negative battery cable a,
and then tighten the negative battery
cable nut 1 to the specified torque.
3. Connect the positive battery cable b.
4. Install the rubber cap 2.
Installing the speed sensor
(optional)
See 6Y8 Multifunction Meter set up manual
for details of the components.
1. Remove the engine ECM cover 1.
2. Cut off the tip a of the nipple 2.
3. Install the extension hose 3 to the nipple
2, and then fasten it using the plastic tie
4.
TIP:
Cut the extension hose 3 to 50 mm (2.0 in).
4. Install the tube 5.
Negative battery cable nut 1:
13 N·m (1.3 kgf·m, 9.6 ft·lb)
a
2
ba
1
2
1
2
a
3
2
4
5
Rigging grommet mounting