EasyManuals Logo

Husqvarna TE 250 2010 Repair Manual

Husqvarna TE 250 2010
420 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #196 background imageLoading...
Page #196 background image
H.34 Part. N. 8000 H1489 (10-2009)
ENGINE REASSEMBLY
Timing chain and primary drive assembly
Install the timing chain slider (1), tighten the screw (2) using a 5 mm wrench (10
Nm, 0.1 Kgm, 7.3 ft/lb, Loctite 243) and make sure the slider moves freely.
Fit the oil pump drive gear (3) making sure the side with the dot is facing out-
side.
Fit the primary drive double gear (4) making sure to line up the timing dot (A)
with the shaft dot (B).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Husqvarna TE 250 2010 and is the answer not in the manual?

Husqvarna TE 250 2010 Specifications

General IconGeneral
BrandHusqvarna
ModelTE 250 2010
CategoryMotorcycle
LanguageEnglish

Related product manuals