• Electronic control unit (5) and voltage regulator (6) position
(TE - TXC).
Electronic control unit installed with the at side down.
Voltage regulator installed over the electronic control unit.
Coat voltage regulator with heat grease.
• Securing the starter motor/solenoid starter cable (TE - TXC)
Connect the starter motor/solenoid starter cable (7) as shown in the gure.
• Securing the engine ground to chassis and engine ground to battery
cables (8) (TE - TXC)
The engine ground to chassis and engine ground to battery cables are secured
to the timing chain tensioner screw.
• Battery negative cable routing (TE - TXC)
Routing of engine ground to battery negative cable (8).