Installation 2-1
Chapter 2. Installing SmartPAC 2
ELECTRIC SHOCK OR HAZARDOUS ENERGY
Disconnect main power before installation.
• Remove all power to the press, press control, and other equipment used with the press.
• Remove all fuses and “tag out” per OSHA 1910.147 Control of Hazardous Energy (Lockout/
Tagout).
• Ensure that installation is performed by qualified personnel.
• Complete all installation procedures before connecting to the AC power source.
Failure to comply with these instructions will result in death or serious injury.
PROGRAMMABLE CAM SWITCH NOT FOR SAFETY USE
Use SmartPAC 2’s programmable cam switch to control auxiliary functions only. The SmartPAC 2
programmable cam capability should never be used to provide timing signals for any safety use
including clutch/brake control or muting of light curtains.
Failure to comply with these instructions will result in death or serious injury.
OPTIONAL MODULES PROCAMPAC AND DIPROPAC INCLUDED IN MANUAL
When you order your SmartPAC 2, you may include the DiProPAC die protection and/or
ProCamPAC programmable cam switch option. This manual includes instructions for installing
and using both modules. Remember that they are options and might not be included in your
system.
If you ordered SmartPAC with other optional modules such as AutoSetPAC load monitor or
ProPAC process monitor, refer to the user manual for that option for complete details on its
installation and use.
UPGRADING FROM ORIGINAL SMARTPAC
See Appendix D for instructions on upgrading from original SmartPAC to SmartPAC 2.