v 1.0 — February 2020 Altanium Matrix5
142 Set the Soak Timers
10.24.6 Set the Soak Timers
At the end of each stage during staged startup or shutdown, when all zones are at their stage
setpoints, they can “soak” for a specified time before the next stage starts. Use the Staging
screen to change the soak time durations.
NOTE: It is not necessary to assign a soak time to each stage. To prevent a delay between
when a stage is at its setpoint and before the stage that follows is activated, set the
timer to 00:00:00.
To set soak timers, do the steps that follow:
1. On the Staging screen, touch the Stage x Soak Timer field that will be set.
NOTE: It is not necessary to select zones to set the soak timer.
2. Enter the time required in the format: HHMMSS.
Soak timers have a range of 00:00:00 to 23:59:59.
3. Touch the Accept button.
4. Do step 1 through step 3 again for each stage in which a soak time is necessary.
10.25 Supply Voltage Screen
The Supply Voltage screen shows a graphical view of the phase pairs from the Supply
Configuration parameter selected in the System Setup screen (in the Heats Setup and
Monitoring tabs):
• Delta 3PH
• Wye 3PH+N
• Single Phase
• Integrated TX
On the Home screen, touch the Supply Voltage button to see the Supply Voltage screen.
The Supply Voltage screen shows a graphic image of the type of configuration that has been
selected. The four supply configurations are shown in Figure 10-16, Figure 10-17,
Figure 10-18, and Figure 10-19. The areas of the Supply Voltage screen are described in
Table 10-13.