Install the Alternative Mounted Operator Interface 219
User Guide v 1.0 — February 2020 Maintenance
8. Connect the male end of the 7.6 m (25 ft) communication cable to the female
communication connector on the bottom of the operator interface MCU. Refer to
Figure 15-29.
9. Connect the female end of the 7.6 m (25 ft) power cable to the male power connector
on the bottom of the operator interface MCU. Refer to Figure 15-29.
10. If necessary, remove the lock out equipment and tag from the main power switch.
11. Energize the system at the main power switch.
15.4.5 Install the Alternative Mounted Operator Interface
Figure 15-29 Remote Operator Interface - MCU Cable Connection
Figure 15-30 Alternative Mounted Operator Interface

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Husky Altanium Matrix5 and is the answer not in the manual?

Husky Altanium Matrix5 Specifications

General IconGeneral
BrandHusky
ModelAltanium Matrix5
CategoryController
LanguageEnglish

Related product manuals