4.
T
ap “Connect” button and connect to Sitelink3D.
5.
After connection to Sitelink3D is succeeded, the Status
changes
to “Connected to Site-Link server!” and “Site ID:”
is displayed. After confirming the connection, tap RETURN
button.
6.
Each setting item in “Site-Link”
menu becomes Enabled as
shown in the figure.
METHOD FOR SETTING CONSTRUCTION INFORMATION
Once the construction information (Operator, Activity, Delay, Material) are set, the current construction informa-
tion can be checked at the office.
To enable the setting of construction information, the control box must be connected to the Sitelink3D.
In addition, the setting of construction information must be completed at the WebPortal of Sitelink3D.
$-'
$-'
$-'
CONTROL BOX SETTING
7-124

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Komatsu PC390LCi-11 and is the answer not in the manual?

Komatsu PC390LCi-11 Specifications

General IconGeneral
BrandKomatsu
ModelPC390LCi-11
CategoryExcavators
LanguageEnglish

Related product manuals