GE VOLUSON
i / VOLUSON
e
D
IRECTION KTI106052, REVISION 10 SERVICE MANUAL
Chapter 4 - Functional Checks 4-1
Chapter 4
Functional Checks
Section 4-1
Overview
4-1-1 Purpose of Chapter 4
This chapter provides procedures for quickly checking major functions of the Voluson i / Voluson e
scanner diagnostics by using the built-in service software, and power supply adjustments.
Section 4-2
Required Equipment
• An empty (blank) DVD/CD+(R)W.
• At least one transducer. See ”Probes” on page 9-50 for an overview.
(normally you should check all the transducers used on the system)
Section 4-3
General Procedure
Table 4-1 Contents in Chapter 4
Section Description Page Number
4-1
Overview
4-1
4-2
Required Equipment
4-1
4-3
General Procedure
4-1
4-4
Functional Checks
4-5
4-5
Backup and Restore Database, Preset Configurations and Images
4-28
4-6
Software Configuration Checks
4-38
4-7
Peripheral Checks
4-39
4-8
Site Log
4-40
!! NOTICE:
Most of the information pertaining to this Functional Checks chapter is found in the
Voluson i / Voluson e Basic User Manual; Table 9-26, “System Manuals - Voluson i,” on page 9-44
and Table 9-27, “System Manuals - Voluson e,” on page 9-46.
!! CAUTION:
SYSTEM REQUIRES ALL COVERS
Operate this unit only when all board covers and frame panels are securely in place.
The covers are required for safe operation, good system performance and cooling purposes.
!! NOTICE:
Lockout/Tagout Requirements (For USA only)
Follow OSHA Lockout/Tagout requirements by ensuring you are in total control of the Power Cable
on the system.