EasyManua.ls Logo

GE Voluson i BT06 - Preparation; Manpower; Tools

GE Voluson i BT06
516 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE VOLUSON
i / VOLUSON
e
D
IRECTION KTI106052, REVISION 10 SERVICE MANUAL
8-46 Section 8-19 - Replacement of the Dock Cart Components
8-19-2 Replacement of the Tray upper
8-19-2-1 Manpower
One person, 10 minutes
8-19-2-2 Tools
Phillips screwdriver 1
Allen wrench 5
8-19-2-3 Preparation
1.) Put away all things on the Tray (e.g. Probes)
8-19-2-4 Tray upper - Removal Procedure
1.) Loosen the 4 Allen screws that fasten the Tray upper and carefully remove it.
2.) On the back side of the Tray screw off the 6 screws and you have the Trag only.
8-19-2-5 Tray upper - Installation Procedure
1.) Place the new Tray and fasten it (see Figure 8-62 on page 8-46 and Figure 8-61 on page 8-46).
Figure 8-61 screw off the 4 screws
Figure 8-62 screw off the 6 screws

Table of Contents

Related product manuals