8-37-5 Front Caster Installation Procedure
1.) Move the ball piece of the joint from old Caster to new Caster (See Figure 8-162).
2.) Align new Caster on the frame and fasten it tightly with four (4x) hexagon screws.
3.) Press the balljoint together and install the lock pin (See Figure 8-162).
4.) To replace the other Front Caster, repeat all the steps from Front Caster Replacement Procedure
on page 8-151, but now using the Bevel Edged board and the Wooden Wedge on the other side of
the system.
5.) Install Bumper and Covers as described in Front Bumper Installation Procedure on page 8-11.
6.) Roll the system off the Bevel Edged Board.
8-37-6 Adjustment
1.) Align front bumper with side bumpers before tighten nuts.

Table of Contents

Other manuals for GE LOGIQ 9

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ 9 and is the answer not in the manual?

GE LOGIQ 9 Specifications

General IconGeneral
BrandGE
ModelLOGIQ 9
CategoryMedical Equipment
LanguageEnglish

Related product manuals