5 Motor control & motor settings
5.1 Required commissioning steps (short overview)
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
5.1.2 Servo control for asynchronous motor (ASM)
Required commissioning steps
1st Wiring check by means of manual test modes
2nd Setting the control mode
3rd Accepting/adapting plant parameters
4th Setting the motor parameters for the servo control
5th Set motor monitoring:
• Monitoring of the motor utilisation (I²xt)
• Motor temperature monitoring
6. Setting the feedback system for the servo control
7. Only required for other manufacturers' motors:
Setting and optimising the current controller
8. Only required for the automatic calculation of the speed controller parameters:
Determining the total moment of inertia
9. Setting the speed controller
10. Setting the position controller
11. Only required for other manufacturers' motors:
• Setting the field controller (ASM)
• Setting the field weakening controller (ASM)
Optional commissioning steps (additional function or fine adjustment)
A. Compensating for inverter influence on output voltage
B. Correction of the stator leakage inductance (Lss)...
C. Asynchronous motor (ASM): Identifying the Lh saturation characteristic
D. Estimating the optimal magnetising current
E. Jerk limitation
F. Notch filters (band-stop filters)
G. "DC-injection braking" function