EasyManua.ls Logo

Brother PR655 - Thread Take-Up Driving Lever Final Assembly

Brother PR655
341 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 - 41
Main unit
Upper shaft unit
Assembly
Assembly
7 Thread take-up driving lever final assembly
1. Attach the roller 2 to the thread take-up differential lever 1, and tighten
the thread take-up roller pin 3.
2. Attach the spacer 4 to the thread take-up differential lever 1, and
temporarily tighten the screw 1.
3. Attach the roller shaft assembly 8 to the thread take-up driving lever 9
with the nut (1, M5) 0 and the spring washer (2-5) A.
4. Apply MOLYKOTE EM-30L to the shaft hole 5 on the thread take-up
bearing.
5. Thread the thread take-up lever assembly's shaft 6 through the hole on the
thread take-up bearing, attach the thread take-up differential lever
assembly to the tip of the thread take-up driving lever assembly's shaft, and
temporarily tighten the screw 1.
*Key point
Temporarily tighten the screw 1 first. Firmly tighten it after
completing thread take-up differential lever height adjustment
in 3 - 58 "Needle bar case final assembly attachment".
6. Apply MOLYKOTE EM-30L to the thread take-up differential lever's
roller 7.
Apply MOLYKOTE EM-30L to the shaft hole on the
thread take-up bearing.
Size of a grain of
rice
Apply MOLYKOTE EM-30L to the thread take-up
differential lever's roller.
Size of a grain of
rice
Tightening torque of thread take-up roller pin: 0.78 - 1.18 N-m
1
Torque
Hand start
2
6 5
3 1
1 4
7 1
8
0
9
A
Bolt, Socket
M5X12

Table of Contents

Other manuals for Brother PR655

Related product manuals