6.4.5 Thrust bearing - install the pads
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 2.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic AR
Support equipment
Description Part No. CSN QTY
Manual ratchet 94016-012 1
Spur geared chain block
WLL 2500 kg
94017-028 2
Eye bolt 94045-M56 1
Shackle 94334A 2
Carrier 94155A 1
Link 94321 1
Supplies
Description QTY
Engine oil A/R
Spare Parts
Description Part No. CSN QTY
Thrust pad A/R
SAFETY PRECAUTIONS
• None
PRELIMINARY OPERATIONS
• The engine must be stopped and made safe for maintenance, refer to section 4.1 Do