6.6.3 Tie rod - install
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 2.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic AR
Support equipment
Description Part No. CSN QTY
Pre-tensioning jacks 94180 2
Eye bolt applicable A/R
Supplies
Description QTY
Molykote paste G A/R
Loctite 577 A/R
Spare Parts
Description Part No. CSN QTY
Tie rod A/R
SAFETY PRECAUTIONS
CAUTION
Use the correct equipment for removal to prevent injury to personnel.
PRELIMINARY OPERATIONS
• The engine must be stopped and made safe for maintenance, refer to section 4.1 Do
maintenance work - general procedure
X72DF
AA00-1903-00AAA-720A-A
Maintenance Manual Tie rod - install
Winterthur Gas & Diesel Ltd.
- 160 - Issue 002 2020-10