7.6.4 Direct controlled injection valve - assemble
Periodicity
Description
Working hours 10 000
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 1.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic AR
Support equipment
Description Part No. CSN QTY
Torque spanner 94011A 1
Wrench extension 94022D-55 1
Wrench extension 94022D-70 1
Supplies
Description QTY
Never-Seez NSBT A/R
Kerosene A/R
Diesel oil A/R
Spare Parts
Description Part No. CSN QTY
Injection valve 1
SAFETY PRECAUTIONS
• None
PRELIMINARY OPERATIONS
• The injection valve must be disassembled and attached on the test bench, refer to
section 7.6.3 Direct controlled injection valve - disassemble
X72DF
AA00-2722-00AAA-710A-A
Maintenance Manual Direct controlled injection valve - assemble
Winterthur Gas & Diesel Ltd.
- 268 - Issue 002 2020-10