11.4.2 Water separator - install
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 1.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic 1
Support equipment
Description Part No. CSN QTY
Lifting tool 94667 3
Disassembly tool 94667H 1
Lever chain hoist 94016-x-x 1
Shackle 94018C 2
Spur-geared chain block 94017-x-x 2
Holder 94667G 1
Supplies
Description QTY
None
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
• None
PRELIMINARY OPERATIONS
• The engine must be stopped and made safe for maintenance, refer to section 4.1 Do
maintenance work - general procedure
X72DF
AA00-6708-00AAA-720A-A
Maintenance Manual Water separator - install
Winterthur Gas & Diesel Ltd.
- 664 - Issue 002 2020-10