8.5.8 Connecting rod - install the top end bearing
Periodicity
Description
Working hours 70000
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 2.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic AR
Support equipment
Description Part No. CSN QTY
Spur-geared chain block 94017-2.5-5-4 1
Lever chain hoist 94016-3.2-5.5 2
Chain 94325 1
Bracket 94326A 2
Deviation pipe 94117B 1
Sling 94039-015 1
Platform 94143. 1
Flange 94336 1
Lever chain hoist 94016-3.2-5.5 2
Supplies
Description QTY
Bearing oil A/R
Steam engine cylinder oil, ISO VG 1000/1500 A/R
Spare Parts
Description Part No. CSN QTY
Bearing shell 1
SAFETY PRECAUTIONS
• None
PRELIMINARY OPERATIONS
• The engine must be stopped and made safe for maintenance, refer to section 4.1 Do
maintenance work - general procedure
X72DF
AA00-3303-02AAA-720A-A
Maintenance Manual Connecting rod - install the top end bearing
Winterthur Gas & Diesel Ltd.
- 420 - Issue 002 2020-10