10.6.2 Fuel rail - do a check of the overpressure safety valve
Periodicity
Description
Working hours 30 000
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 1.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic AR
Support equipment
Description Part No. CSN QTY
Injector test bench 94272 1
Valve holder 94272A 1
HP oil pump 94931 1
Pressure gauges 94934A 2
HP hoses 94935 2
Supplies
Description QTY
Test fluid, ISO 4113 A/R
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
WARNING
Health Hazard. Test fluid is harmful to your health.
PRELIMINARY OPERATIONS
• The overpressure safety valve must be removed.
• Read the data in the instructions from the manufacturer about the specifications of the
test bench.
X72DF
AA00-5562-01AAA-360A-A
Maintenance Manual Fuel rail - do a check of the overpressure safety valve
Winterthur Gas & Diesel Ltd.
- 594 - Issue 002 2020-10