7.10.6 Pilot injection valve - install the pre-chamber
Periodicity
Description
Working hours 18 000
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 1.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic AR
Support equipment
Description Part No. CSN QTY
Eye bolts N/A 2
Pre-chamber A/R 1
Seal N/A 1
O-ring N/A 1
Supplies
Description QTY
None
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
• None
PRELIMINARY OPERATIONS
• The pilot injection valve must be removed, refer to section 7.10.1 Pilot injection valve -
remove
X72DF
AA00-2790-00AAB-720A-A
Maintenance Manual Pilot injection valve - install the pre-chamber
Winterthur Gas & Diesel Ltd.
- 342 - Issue 002 2020-10