7.10.5 Pilot injection valve - remove the pre-chamber
Periodicity
Description
Working hours 18 000
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 1.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic AR
Support equipment
Description Part No. CSN QTY
Eye bolts N/A 2
Supplies
Description QTY
None
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
• None
PRELIMINARY OPERATIONS
• The pilot injection valve must be removed, refer to section 7.10.1 Pilot injection valve -
remove
X72DF
AA00-2790-00AAB-520A-A
Maintenance Manual Pilot injection valve - remove the pre-chamber
Winterthur Gas & Diesel Ltd.
- 340 - Issue 002 2020-10