8.1.2 Crankshaft - install the work platform
Periodicity
Description
Unscheduled
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 0.25 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic AR
Support equipment
Description Part No. CSN QTY
Platform 94143 1
Adjustable platform 94142 1
Supplies
Description QTY
None
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
CAUTION
Do not operate the engine or the turning gear when the platforms are installed. This can
cause injury to personnel and damage to equipment.
PRELIMINARY OPERATIONS
• The engine must be stopped and made safe for maintenance, refer to section 4.1 Do
maintenance work - general procedure
X72DF
AA00-3103-00AAA-720A-A
Maintenance Manual Crankshaft - install the work platform
Winterthur Gas & Diesel Ltd.
- 356 - Issue 002 2020-10