EasyManuals Logo
Home>WinGD>Engine>X62DF

WinGD X62DF User Manual

Default Icon
902 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #265 background imageLoading...
Page #265 background image
PROCEDURE
1 Release the pressure of the test bench.
2 Remove the safety container from the valve holder (003, Figure 7-43).
3 Disconnect the HP hose from the connecting piece.
4 Disconnect the cable from the test bench.
Fig 7-43 Direct controlled injection valve - disassemble
005
003
001
004
002
5 Turn the valve holder (003) through 180° so that the nozzle tip (002) points up.
6 Safety the valve holder (003) in that position on the test bench.
7 Loosen the locknut of the nozzle tip (002).
8 If it is necessary to remove the nozzle tip (002) from the nozzle body, do as follows:
8.1 Remove the loosened locknut.
8.2 Make sure that the needle, the compression spring and the tappet are removed
from the coupling nut (002, Figure 7-44).
NOTE: It is possible, but not recommended, to replace the nozzle tip with the
needle installed. Remove only the locknut.
8.3 Attach the hexagonal nut (003) to the coupling nut (002).
8.4 Put the plate (004) in the clearance between the coupling nut (002) and the
nozzle tip (001).
8.5 Carefully turn the hexagonal nut (003) up to move the nozzle tip (001).
8.6 Remove the nozzle tip (001) from the coupling nut (002).
8.7 Remove the plate (004) and the hexagonal nut (003) from the nozzle tip (001).
Fig 7-44 Nozzle tip - remove
002
001
003
004
X72DF
AA00-2722-00AAA-530A-A
Maintenance Manual Direct controlled injection valve - disassemble
Winterthur Gas & Diesel Ltd.
- 265 - Issue 002 2020-10

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the WinGD X62DF and is the answer not in the manual?

WinGD X62DF Specifications

General IconGeneral
BrandWinGD
ModelX62DF
CategoryEngine
LanguageEnglish

Related product manuals