10.1.3 Servo oil pump - install
Periodicity
Description
Working hours 36000 (HAWE)
Working hours 66000 (Bosch)
Duration for performing preliminary requirements 0.0 man-hours
Duration for performing the procedure 2.0 man-hours
Duration for performing the requirements after job completion 0.0 man-hours
Personnel
Description Specialization QTY
Engine crew Basic AR
Support equipment
Description Part No. CSN QTY
Shackles 94019K 2
Spur-geared chain block 94017-0.5-5-4 2
Lifting tool 94651 1
Slings WLL 1000 kg 94039-002 2
Deviation pipe 94319 1
Sling WLL 2000 kg 94039-005 1
Lever chain hoist 94016-0.8-5.5 1
Shackle 94019P 1
Supplies
Description QTY
None
Spare Parts
Description Part No. CSN QTY
None
SAFETY PRECAUTIONS
CAUTION
Make sure that you use the correct equipment to lift and move the servo oil pump. This
will prevent injury to personnel.
PRELIMINARY OPERATIONS
• The engine must be stopped and made safe for maintenance, refer to section 4.1 Do
maintenance work - general procedure
X72DF
AA00-5551-00AAA-720A-A
Maintenance Manual Servo oil pump - install
Winterthur Gas & Diesel Ltd.
- 536 - Issue 002 2020-10